Transition Piece

A transition piece is used as a connection between a driven pile (Monopile) and the tower of an offshore wind energy plant. eingesetzt. Der Montageablauf sieht vor, dass ein Transition Piece mit einer gewissen Überlapplänge über den Monopile gestülpt wird.

A transition piece is used as a connection between a driven pile (Monopile) and the tower of an offshore wind energy plant. The installation procedure provides that a transition piece is placed with a certain overlap length on the monopile. The resulting annular gap between the two tubes is then filled with a grout.

Cylindrical steel tube with shear ribs
Conical steel tube without shear ribs

The grouted annular gap has two main functions:

  1. the transfer of the charges related to the permanent and variable actions,
  2. and for compensation of imperfections due to the driving procedure.

In the formation of the transition piece, two variants have prevailed:

  1. Cylindrical steel pipes with thrust ribs and
  2. Conical steel pipes without shear ribs.

By 2007, more cylindrical Grout connections were used without shear ribs, which support and fatigue strength under dynamic loading have proved to be insufficient. There were landslides between transition piece and monopile (shake-down effect). This led to intensive research and new regulations in the offshore guidelines. Today's structures with transition piece planned either as cylindrical steel pipes with thrust ribs or conical steel pipes without shear ribs.

Due to the large rolling mills and the use of thick plates can now transition piece to be manufactured to a diameter of more than 7,000 mm, which are then eligible for the so-called XL-monopile used.

Our services

On the part of SKI Ingenieurgesellschaft the following services can be provided:

  • Load simulations in the ultimate limit state
  • Calculation of fatigue loads in the time and frequency domain
  • Evidence for welded connections
  • Calculation of Ring flange connections
  • Consideration of wave loads on offshore towers
  • Design of Grouted Joints and pile-sleeve connections
  • Local stress and fatigue calculations for grout and steel
OWEA - Monopile mit Gründung
OWEA - Monopile

Wind turbine with a monopile foundation

SKI_Logo_600px_72dpi_rgb

Copyright © 2020 SKI Ingenieuers. mbH

SKI Ingenieurges. mbH
Mengendamm 12
30177 Hannover

Phone: +49 (0) 511 / 261847-0

Consulting Engineers

Ingenieurkammer Niedersachsen

BWE Expert Advisory Board

Bundesverband der Windenergie