Hybrid tower

Measurement technology for a hybrid tower In the course of constructing a new prototype wind turbine as a hybrid tower, it was equipped with various measurement sensors. The aim of the sensors is to determine accelerations, temperatures and movements of the concrete shaft. Following the evaluation, conclusions are to be drawn about the construction and the load-bearing behaviour of the prototype. SKI Ingenieurges. mbH is

200m³ Spent grains silo

Installation of a 200m³ spent grains silo In the course of the modernisation of a local brewery, a finished spent grains silo was handed over to the end customer and installed. The Trebersilo with a diameter of 4m and a total height of approx. 26m has a capacity of approx. 200m³. The structural calculations for the silo, as well as the substructure with anchoring were carried out by the

SKI_Logo_600px_72dpi_rgb

Copyright © 2020 SKI Ingenieuers. mbH

SKI Ingenieurges. mbH
Mengendamm 12
30177 Hannover

Phone: +49 (0) 511 / 261847-0

Consulting Engineers

Ingenieurkammer Niedersachsen

BWE Expert Advisory Board

Bundesverband der Windenergie